The Ministry of Transport and Sustainable Mobility has put out to tender for 6.7 million euros (VAT included) the works to reinforce the resilience of the high-speed line (LAV) between Madrid-Barcelona-French border, as it passes through the province of Zaragoza, in the face of adverse weather conditions and, in particular, for episodes of heavy rain.
The project, which will be carried out by Adif, includes carrying out various works at five points along a 13 km section of this line to reinforce its drainage system, facilitating the drainage of rainwater into the nearby Jalón River.
The works to be carried out include raising the level of service roads to prevent water from flowing onto the tracks, extending ditches , building retaining walls, channelling water from a stream under the tracks and new drainage works to increase drainage capacity.
In this regard, the Ministry has also recently contracted the deployment of lightning protection systems in the event of strong storms on conventional lines in Tarragona and Ciudad Real and the reinforcement of a railway bridge in the town of Valdepeñas. In this way, actions are being promoted to reinforce the resistance of the railway network to possible adverse effects derived from climate change.

The “Z” of Zaragoza triumphs in Europe: this is the tourism award it can win in Bulgaria
The seven official viewing spots for the eclipse in Aragon: for 70,000 people and giant screens
The disaster is confirmed: Real Zaragoza suffers a resounding and tragic fall from professional football
Fear of driving is growing in Spain, and more and more drivers are giving up on cars
The European Space Agency chooses Aragon for the international broadcast of the August 12 eclipse
The Court indicts Zapatero in the “Plus Ultra case”